BREAKING NEWS National Weather Service Sacramento issues warnings for Dixie Fire burn scar area Full Story
BREAKING NEWS Over 12,000 PG&E customers without power North State counties Full Story
BREAKING NEWS Mudslides cause Highway 70 closure Full Story
BREAKING NEWS Flash Flood Watch issued for Butte County Full Story
SEVERE WX : High Wind Warning - Flash Flood Warning View Alerts

Yuba City 5th Street Bridge Replacement Project Schedules Demolition

Second Street will be closed to allow construction crews to demolish the existing railroad bridge on the Yuba City side.

Posted: Mar 14, 2018 2:11 PM

Friday March 16th starting at 7 p.m. going through the night until 7 a.m. Sunday morning construction crews will be removing the railroad bridge over Second Street in Yuba City.

Second Street will be closed to allow construction crews to demolish the existing railroad bridge on the Yuba City side.

This work is a part of operations of the 5th Street Bridge Replacement Project.

The 5th Street Bridge will remain open in both directions during the weekends demolition work.

Detours will be available for the Second Street closure.

DOWNLOAD OUR NEWS APP FOR LATEST UPDATES: iOS | Android

Chico
Cloudy
55° wxIcon
Hi: 58° Lo: 54°
Feels Like: 55°
Oroville
Cloudy
57° wxIcon
Hi: 58° Lo: 53°
Feels Like: 57°
Paradise
Cloudy
55° wxIcon
Hi: 54° Lo: 47°
Feels Like: 55°
Chester
Cloudy
56° wxIcon
Hi: 43° Lo: 35°
Feels Like: 56°
Red Bluff
Cloudy
56° wxIcon
Hi: 57° Lo: 50°
Feels Like: 56°
Willows
Cloudy
55° wxIcon
Hi: 59° Lo: 54°
Feels Like: 55°
A significant weather system will impact our area beginning late tonight, lasting through the day on Monday. This includes a large amount of snow for the mountains, with rain and wind for the valley and foothills. A steady rain will begin to move into our area around 1am Sunday.
KHSL Severe
KHSL Radar
KHSL Temperatures

Community Events